Skip to main content
1.850m²
10 images
Schaliënhoevedreef 26 , 2800 - Mechelen

This logistics complex located in Mechelen brings together existing warehouses and a new construction project intended for storage and distribution activities. The existing site includes three warehouses for a total area exceeding 16,000 m². Warehouse 1 has 8,132.34 m², 10 loading docks, a large door, and a sanitary block with a shower and toilets. Warehouse 2 offers 4,697.87 m², 4 loading docks, and a large door. Warehouse 3 spans 3,628.94 m² with a large door and offers the possibility of adding an additional loading dock. In addition, a new building will be developed with four connected units of 1,850 m² each, totaling 7,400 m² of warehouse space with 6 loading docks. Each new unit integrates 185 m² of office space above the docks, representing 740 m² of offices across the entire new project. The site is equipped with parking spaces, charging stations for electric vehicles, and bicycle parking. Contact ALLTEN for more information.

Building

Construction year
2026
Inside parking
No
Outside parking
Yes
Sectional door
Yes

Basic Equipment

Access for people with handicap
Yes
Kitchen
Yes
Air conditioning
Yes
Elevator
No
Toilettes M/W
Yes
Double glass windows
Yes
Type of kitchen
Kitchenette

Security

Emergency exit
Yes

Ground details

Type of environment
Industrial estate

General Figures

Offices
185m²
Offices
125
Warehouse
1850m²
Warehouse price/m²/y
75

Location

Schaliënhoevedreef 26 , 2800 - Mechelen

Contact us for more information

Contact us